1. I Workflow Stage (2006)

I Workflow Stage (2006)

  • Unit: Crude Unit - 1.
  • Initial nameplate capacity: 0.4 MTPA.
  • After re-equipment in 2008 nameplate capacity amounted to 0.74 MTPA.
  • Processing depth: 55%.
  • Storage tanks: 52,000 cu.m.
  • 2 either-direction railway tank filling racks.
  • 2 road tanker filling racks.
  • Capacity of crude oil transportation through oil trunk pipelines of Transneft JSC – 0.5 MTPA.
  • Connected to the Shaim – Tyumen oil trunk pipeline with the capacity of up to 0.6 MTPA.